Six months before the move means detailed planning becomes crucial. Industrial relocation plans should include specific timelines and assigned responsibilities at this stage.
Six-month preparation checklist:
Logistics Coordination:
- Create detailed warehouse layout plans for the new facility
- Complete comprehensive inventory of all equipment and assets
- Document current processes and workflows
- Plan equipment disconnection procedures with technical teams
- Notify suppliers, customers, and business partners of upcoming move
- Update business registrations and licenses with new address
- Arrange insurance coverage for the transition period
Moving Pallet Racking Brisbane: Special Considerations
Understanding Pallet Racking Systems
Moving pallet racking in Brisbane facilities requires specialist knowledge and expertise. These heavy-duty systems need careful dismantling, transport, and reassembly to ensure safety and functionality. Professional industrial movers typically have extensive experience with various racking types.
Common racking systems found in warehouses:
- Selective pallet racking (most common type)
- Drive-in/drive-through racking for high-density storage
- Push-back racking systems for last-in-first-out inventory
- Cantilever racking for long items like timber or pipe
- Mezzanine floor systems for multi-level storage
- Mobile racking installations for space optimisation
Safety requirements for moving pallet racking in Brisbane:
- Qualified structural engineers for dismantling assessments
- Load capacity documentation and compliance verification
- Safety inspections before removal
- Proper equipment for handling heavy components
- Compliance with Australian standards (AS4084-2023)
- Professional reassembly with engineering certification
- Post-installation load testing
Racking System Documentation
